DETAILED ENGINEERING DESIGN AND PREPARATION OF TENDER DOCUMENTS FOR COASTAL ROAD LINKS BETWEEN KESRWAN - FTOUH

DETAILED ENGINEERING DESIGN AND PREPARATION OF TENDER DOCUMENTS FOR COASTAL ROAD LINKS BETWEEN KESRWAN - FTOUH
LEBANON |  Project Value: 23.6 M$  |  2005

The project includes the design of :
- 3 viaducts.
- 2 pre-stressed concrete overpasses.

Client: COUNCIL FOR DEVELOPMENT AND RECONSTRUCTION
Share by: