DETAILED ENGINEERING DESIGN AND PREPARATION OF TENDER DOCUMENTS FOR THE WIDENING OF THE EXISTING HIGHWAY A1 IN THE CAZA OF KESRWAN

DETAILED ENGINEERING DESIGN AND PREPARATION OF TENDER DOCUMENTS FOR THE WIDENING OF THE EXISTING HIGHWAY A1 IN THE CAZA OF KESRWAN
LEBANON |  Project Value: 37 M$  |  2005-2007

This project includes the design of :
- 5 pre-stressed concrete overpasses.
- 1 RC overpass.
- 3 RC underpasses.
- 4 RC bridges.
- The widening of 3 existing bridges.
- The rehabilitation and strengthening of the 7 existing bridges.

Client: COUNCIL FOR DEVELOPMENT AND RECONSTRUCTION