METN EXPRESSWAY

METN EXPRESSWAY
LEBANON 1996

Preliminary and Detailed Design and preparation of the Tender Documents.
The project includes the design of :
- 32 viaducts and bridges.
- 21 pre-stressed concrete overpasses.
- 12 reinforced concrete underpasses.
- 150,000 sq.m. of retaining walls.
- 78 culverts.


Client: COUNCIL FOR DEVELOPMENT AND RECONSTRUCTION
Share by: