NAHR BEIRUT INTERCHANGE

NAHR BEIRUT INTERCHANGE
LEBANON |  Project Value: 4 M$  |  Type of Services: Control of design  | 1972-1973

Interchange grouping several structures and access roads.
Main structures of this complex :
- East entry bridge : continuously supported prestressed concrete bridge (spans 27m, 48m and 32m).
- Tramway bridge : continuously supported prestressed concrete bridge (total length of deck = 75m).
- Several accesses (total number 11- number of access bridges 5).
- Sewage and drainage networks.
NOTE : The design of the harnessing of Nahr Beirut and of the interchange have been carried out in association with the E.T.E.C. office and with the office of Mr. NOEL ABOUHAMAD.

Client: CONSEIL EXECUTIF DES GRANDS PROJETS
Share by: