PAN ARAB HIGHWAY MDEIREJ – MASNAA SECTION

PAN ARAB HIGHWAY MDEIREJ – MASNAA SECTION
LEBANON |  Project Value: 50 M$  |  2000-2001

The revision of the design of the Mdeirej – Masnaa section has involved :
- The modification of the alignment over ten kilometers.
- The revision, keeping up to date and reduction of the expropriation.
- The design of 6 interchanges, of 2 main viaducts more than 320m and 410m long.
- The design of 10 underpasses, 10 overpasses and of 100 hydraulic structures.
- The design of more than 50,000 m2 of retaining walls.
- The design of the drainage of the pavement, lighting and equipment : vertical signalisation, pavement marking and retaining appliances.
- Tender documents.

CLIENT: CONSEIL EXECUTIF DES GRANDS PROJETS AND COUNCIL FOR DEVELOPMENT AND RECONSTRUCTION
Share by: