BEIRUT - SYRIAN BORDER HIGHWAY, BEIRUT - CHTAURA SECTION

BEIRUT - SYRIAN BORDER HIGHWAY, BEIRUT - CHTAURA SECTION
LEBANON |  Project Value: 350 M$  |  Type of Services: Control of design  | 1978-1981

(Design carried out in joint venture with the office of DORSCH CONSULT).
Main characteristics :
- Mountain highway L = 41 Km.
- Eight interchanges.
- Several over passes and underpasses (number=50).
- Exceptional structures for the crossing of important valleys.
- Two tunnels formed of two tubes each (Aley tunnel, length 740m and Sofar tunnel, length 750m).
- Several hydraulic structures (number = 120).
- Deviation of roads crossing the highway L = 10 Km.

Client: CONSEIL EXECUTIF DES GRANDS PROJETS