REHABILITATION OF THE ASFOUR BRIDGE AND OF BRIDGES AT CHEKKA INTERCHANGE

REHABILITATION OF THE ASFOUR BRIDGE 
AND OF BRIDGES AT CHEKKA INTERCHANGE
Lebanon |  Project Value: 300,000$  |  Type of Services: Control of design  | 1996

The survey consisted in :
- The study of the repair and treatment of the elements of the structures.
- The design of the reinforcement of Asfour bridge deck.
- Waterproofing of deck.
- Supports and joints.
- Drainage and equipment.

Client: CONSEIL EXECUTIF DES GRANDS PROJETS
Share by: