HOME
ABOUT US
DIVISIONS
Structural Engineering
Transportations
Architecture & Planning Design
Environmental & Water Resources
Geotechnical Engineering
FEATURED PROJECTS
CONTACT US
WIDENING OF THE RIGHT BANK ROAD OF NAHR BEIRUT
WIDENING OF THE RIGHT BANK ROAD OF NAHR BEIRUT
LEBANON
| Project Value: 10 M$
| 1985
Widening of a section from 11m to 33m and continuation of this road to Hazmieh (total length 3.3 Km).
CLIENT: CONSEIL EXECUTIF DES GRANDS PROJETS
© 2023 Gicome. All Rights Reserved. Created by
N-IDEA
Share by: