
BYBLOS WATER SUPPLY AND CANALISATION
LEBANON | Project Value: 1.5 M$ | 1987
Water supply fromNahr Ibrahim to Byblos town. The project included :
- New water intake.
- Sedimentation basin on the canal from Adonis to Nahr Ibrahim.
- Water supply from Nahr Ibrahim to Byblos town
- Water intake conduct φ300mm, length 1.5Km from Byblos water treatment station to the two reservoirs.
Client: COUNCIL FOR DEVELOPMENT AND RECONSTRUCTION