
BEIRUT – BAABDAT – BIKFAYA EXPRESSWAY - LEBANON
LEBANON | Project Value: 70 M$ | 1979
Main characteristics :
- Mountain expressway L = 20.5 Km, anticipated for 2 x 3 lanes over a length of 12.5 Km and as 2 x 2 lanes over a length of 8 Km
- Five interchanges
- Displacing the existing roads crossing the expressway (Length = 4 Km)
CLIENT: MINISTRY OF PUBLIC WORKS