

EL-FIDAR BRIDGE ON THE BEIRUT – TRIPOLI HIGHWAY
LEBANON | Project Value: 1 M$ | Type of Services: Control of design | 1973
Arch bridge – Total length of deck 132m – The arch is end fixed to the foundations,
its span is 95m.
NOTE : design carried out in association with the office of Mr. NOEL ABOUHAMAD.
Client: CONSEIL EXECUTIF DES GRANDS PROJETS