
NORTHERN ENTRANCES OF BEIRUT
LEBANON | 1982-1984
They include :
- The Nahr Beirut – Borj Hammoud connection (L=1.5Km)
- Khabbaz and Almaza bridges
Two prestressed concrete bridges with precast beams. Each construction is composed of a 33.5 m span and of six 20 m spans.
NOTE : This design has been carried out in association with the office of the Town planner Mr. Samir MAALOUF.
CLIENT: CONSEIL EXECUTIF DES GRANDS PROJETS